Home Experiments & evolution Verifiability
VERIFIABILITY
What must remain verifiable
A result without its context is not a result, it is a poster. Versions, data, settings and scenarios are part of the figure — and more than once, it was the instrument that turned out to be wrong before the model.
A figure always comes with four things
- The model version — a score obtained on one version does not carry over to the next.
- The data — which thread the test was replayed on, and whether it was real or fabricated.
- The settings — compression, context length, temperature, seed.
- The scenario — what exactly was asked, and how many times.
That is why the scores on this site are given as counts — nine out of nine, sixteen out of sixteen — and never as percentages. A percentage hides its count, and nine measurements presented as 100 % is a polite way of lying.
The instrument before the model
It is the most useful lesson of the project, and it is counter-intuitive: when a score improves abruptly, the first hypothesis is not that the model has got better, it is that the grid has broken. A test that has become too easy, a question badly rephrased, a test case that leaks the answer in its wording.
More than once during the year, the investigation started on the model and ended on the measurement. Hence the rule: the instrument is checked first.
Failures are published
They are not filed away separately. The project journal carries them at the same rank as the rest: a 26-billion-parameter model trained and then set aside, a 9B thrown out after merging, a several-week investigation into a verbosity regression, six months of architecture abandoned.
There is a practical reason, besides honesty. A failure is expensive to invent. Nobody fabricates the detailed account of a model that does not know how to stop generating. It is, paradoxically, the most verifiable part of a project.
Everything is written down
The journal covers the period from 11 February to 9 October 2026, in the order in which things happened: measurement records, training-block specifications, run reports — successful and failed alike — and the successive maps of the architecture.